{"id":1676,"date":"2022-06-28T15:17:37","date_gmt":"2022-06-28T15:17:37","guid":{"rendered":"http:\/\/wma.gov.gh\/?p=1676"},"modified":"2022-07-11T21:09:15","modified_gmt":"2022-07-11T21:09:15","slug":"sod-cutting-for-commercement-of-projects-boreholes-toilets-and-urinal-and-provisions-of-poly-tanks-with-concreate-stands","status":"publish","type":"post","link":"https:\/\/wma.gov.gh\/index.php\/sod-cutting-for-commercement-of-projects-boreholes-toilets-and-urinal-and-provisions-of-poly-tanks-with-concreate-stands\/","title":{"rendered":"MCE CUTS SOD FOR CONSTRUCTION OF WATER &#038; SANITATION PROJECTS"},"content":{"rendered":"<div class=\"kvgmc6g5 cxmmr5t8 oygrvhab hcukyx3x c1et5uql ii04i59q\">\n<p>The Municipal Chief Executive Alexander Obour Damoah has cut sod for construction of new projects under Water &amp; Sanitation projects in Wenchi.<\/p>\n<p>The projects include;<\/p>\n<ul style=\"list-style-type: square;\">\n<li>furnishing, provision of 5No. Massaging Beds and 6No. 1.5HP Split Air Conditioner at Wenchi Sports Field Dressing Room.<\/li>\n<li>drilling and construction of 1No. Boreholes, provision of of 1No. 5000 Ltrs Water Storage Tank and construction of 1No. 4-Meter High Concrete Stand at Slaughter House.<\/li>\n<li>drilling and construction of 1No. Boreholes, provision of of 1No. 5000 Ltrs Water Storage Tank and construction of 1No. 4-Meter High Concrete Stand at Wenchi Maize Market.<\/li>\n<li>construction of 4-unit WC Toilet with 2-unit Urinal under the existing Spectators Stand, installation of 1.5HP Split Air Conditioner at the Press Box at the Wenchi Sports Field, drilling of and mechanisation of 1No. Borehole, construction of 1No. 4-Meter High Concrete Stand and provision of 5000Ltrs Water Storage Tank<\/li>\n<li>construction of&nbsp;<span style=\"color: initial;\">1No. 5-Seater WC Toilet, 4-Unit Urinal, drilling and mechanization of 1No. Borehole with 5000Ltrs Water Storage Tank and construction of 4-Meter High Concrete Stand at Wenchi Old Market.<\/span><\/li>\n<li>construction of 6-Seater Aqua Privy Toilet with 2-unit Urinal and provision of 5000Ltrs Water Storage for Aswaq Cluster of Schools at Kokroko<\/li>\n<\/ul>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">&nbsp;<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\">In separate ceremonies to cut sod for commencement of work, the MCE encouraged traders, business operators and owners, rate payers and the public to pay their rates, fees toes. The projects were funded with the Assembly&#8217;s Internally Generated Fund (IGF) and the District Assembly Common Fund (DACF-RFG IV) The Contractors undertaking the projects were Sam Adomako Construction &amp; Engineering Services Ltd, JOA Constructions, Surprise Vision Construction Ltd and P &#8211; Gyabaah Enterprise. The Chief Executive admonished beneficiaries and Contractors of the projects to cooperate and deliver on the expected duration to serve the needed results.<\/div>\n<div dir=\"auto\">The projects would be monitored and supervised by the Works Engineer of the Assembly Bernard Kwadwo Opoku and Team. The e<span style=\"color: initial;\">ntourage for the ceremony included the PM, Assembly Members of the beneficiary areas, Heads of Department, Chairpersons of Works Committee, and other stakeholders.<\/span><\/div>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\"><em><strong>Source: ISD\/WMA<\/strong><\/em><\/div>\n<div dir=\"auto\"><strong>By: Stanick Sofel Amuzu Kpodo<\/strong><\/div>\n<div dir=\"auto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-1677\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUT-300x225.jpg\" alt=\"\" width=\"243\" height=\"182\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUT-300x225.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUT-1024x768.jpg 1024w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUT-768x576.jpg 768w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUT.jpg 1080w\" sizes=\"auto, (max-width: 243px) 100vw, 243px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-1678\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUTTING-300x225.jpg\" alt=\"\" width=\"247\" height=\"185\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUTTING-300x225.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUTTING-1024x768.jpg 1024w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUTTING-768x576.jpg 768w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SOD-CUTTING.jpg 1080w\" sizes=\"auto, (max-width: 247px) 100vw, 247px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-1679\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SCUT-300x225.jpg\" alt=\"\" width=\"246\" height=\"184\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SCUT-300x225.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SCUT-1024x768.jpg 1024w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SCUT-768x576.jpg 768w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SCUT.jpg 1080w\" sizes=\"auto, (max-width: 246px) 100vw, 246px\" \/><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Municipal Chief Executive Alexander Obour Damoah has cut sod for construction of new projects under Water &amp; Sanitation projects in Wenchi. The projects include; furnishing, provision of 5No. Massaging Beds and 6No. 1.5HP Split Air Conditioner at Wenchi Sports Field Dressing Room. drilling and construction of 1No. Boreholes, provision of of 1No. 5000 Ltrs [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":1678,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[7,4],"tags":[],"class_list":["post-1676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects","post-with-thumbnail","post-with-thumbnail-icon"],"_links":{"self":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/1676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/comments?post=1676"}],"version-history":[{"count":4,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/1676\/revisions"}],"predecessor-version":[{"id":1799,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/1676\/revisions\/1799"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media\/1678"}],"wp:attachment":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media?parent=1676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/categories?post=1676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/tags?post=1676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}