{"id":1953,"date":"2022-04-05T17:26:02","date_gmt":"2022-04-05T17:26:02","guid":{"rendered":"http:\/\/wma.gov.gh\/?p=1953"},"modified":"2022-07-17T18:10:44","modified_gmt":"2022-07-17T18:10:44","slug":"mce-assures-completion-of-wenchi-sports-field","status":"publish","type":"post","link":"https:\/\/wma.gov.gh\/index.php\/mce-assures-completion-of-wenchi-sports-field\/","title":{"rendered":"MCE ASSURES COMPLETION OF WENCHI SPORTS FIELD"},"content":{"rendered":"<div class=\"kvgmc6g5 cxmmr5t8 oygrvhab hcukyx3x c1et5uql ii04i59q\">\n<div dir=\"auto\">The Municipal Chief Executive for Wenchi Alexander K. Obour Damoah has assured the people in the Municipality to complete the Wenchi Sports Stadium as immediately as possible for use in 2022.<\/div>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\">The MCE gave the assurance in a One-on-One interview with Wenchi based Ewiase 95.7 Fm after a site monitoring and inspection tour on the facility by the Chief Executive and the technical team for the project to assess the progress of work and early time completion possibility.<\/div>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\">The radio programme formed part of public engagements and interaction with the constituents to update them on key development projects and policies being undertaken by the Assembly.<\/div>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\">Hon Alexander Obour Damoah noted that funding from the District Performance Assessment Tool (DPAT) had been made readily available for the project, thus barring any unforeseen circumstances and technical challenges, the project could be completed by June 2022.<\/div>\n<div dir=\"auto\"><img decoding=\"async\" class=\"alignnone size-medium wp-image-1954\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP-300x150.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP.jpg 592w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img decoding=\"async\" class=\"alignnone size-medium wp-image-1958\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP4-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP4-300x150.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP4-1024x512.jpg 1024w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP4-768x384.jpg 768w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP4-960x480.jpg 960w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP4.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img decoding=\"async\" class=\"alignnone size-medium wp-image-1957\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP3-300x156.jpg\" alt=\"\" width=\"300\" height=\"156\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP3-300x156.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP3-1024x532.jpg 1024w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP3-768x399.jpg 768w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2022\/07\/SP3.jpg 1059w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/div>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\">The project components include construction of the Sports Arena and Grassing, furnishing of Dressing Room consisting 5No. 1.5 HP Air Conditioners, wooden cabinet along the walls of the home and away dressing, drilling and mechanisation of 1No. Borehole with overhead tank (4, 000 Ltrs). Construction of chain-link fencing and chain-link tunnel at the Sports Field. Construction of 3-seater WC toilet with 3-urinal bowls under the existing VIP Stand and the provision of 1No.1.5 HP Air-conditioner at the Press Box of the VIP Stand at the Field.<\/div>\n<\/div>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<div dir=\"auto\">Source: Information Services Department (ISD\/WMA)<\/div>\n<div dir=\"auto\">By: Stanick Sofel Amuzu Kpodo<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Municipal Chief Executive for Wenchi Alexander K. Obour Damoah has assured the people in the Municipality to complete the Wenchi Sports Stadium as immediately as possible for use in 2022. The MCE gave the assurance in a One-on-One interview with Wenchi based Ewiase 95.7 Fm after a site monitoring and inspection tour on the [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":1955,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-1953","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","post-with-thumbnail","post-with-thumbnail-icon"],"_links":{"self":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/1953","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/comments?post=1953"}],"version-history":[{"count":1,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/1953\/revisions"}],"predecessor-version":[{"id":1959,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/1953\/revisions\/1959"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media\/1955"}],"wp:attachment":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media?parent=1953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/categories?post=1953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/tags?post=1953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}