{"id":911,"date":"2019-05-06T04:21:04","date_gmt":"2019-05-06T04:21:04","guid":{"rendered":"http:\/\/wma.gov.gh\/?p=911"},"modified":"2020-10-16T17:08:00","modified_gmt":"2020-10-16T17:08:00","slug":"mp-inspects-road-projects-in-wenchi","status":"publish","type":"post","link":"https:\/\/wma.gov.gh\/index.php\/mp-inspects-road-projects-in-wenchi\/","title":{"rendered":"MP INSPECTS ROAD PROJECTS IN WENCHI"},"content":{"rendered":"<p>The Member of Parliament and Minister for Planning Professor George Gyan Baffour has inspected ongoing road projects in the Municipality.<\/p>\n<p>The projects were two separate construction works at Wanuoma Portion of Wenchi-Wa Road undertaken by J.A Adom and Pentecost Portion of Akonkontiwa inner roads by Messr EN Donkor Ghana Ltd. This also covers the Day Nursery Roads, Viglosam area and Wenchi Senior High School roads.<\/p>\n<p>In his remarks, the MP appealed to the community members to cooperate with the contractors to&nbsp;complete the projects within schedule. He was impressed about the level of work done at the time of the visit and hoped the project would serve the needed purpose of improving the living condition of the people since it would create access routes and expand the frontiers of the Municipality.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-912\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/MP-ROAD.-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/MP-ROAD.-300x225.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/MP-ROAD.-768x576.jpg 768w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/MP-ROAD..jpg 960w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Credit: Information Services Services Department (ISD), Wenchi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Member of Parliament and Minister for Planning Professor George Gyan Baffour has inspected ongoing road projects in the Municipality. The projects were two separate construction works at Wanuoma Portion of Wenchi-Wa Road undertaken by J.A Adom and Pentecost Portion of Akonkontiwa inner roads by Messr EN Donkor Ghana Ltd. This also covers the Day [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":913,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[7,4],"tags":[],"class_list":["post-911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects","post-with-thumbnail","post-with-thumbnail-icon"],"_links":{"self":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/comments?post=911"}],"version-history":[{"count":1,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/911\/revisions"}],"predecessor-version":[{"id":914,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/911\/revisions\/914"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media\/913"}],"wp:attachment":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media?parent=911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/categories?post=911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/tags?post=911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}