{"id":994,"date":"2020-09-11T13:13:30","date_gmt":"2020-09-11T13:13:30","guid":{"rendered":"http:\/\/wma.gov.gh\/?p=994"},"modified":"2020-10-16T16:17:44","modified_gmt":"2020-10-16T16:17:44","slug":"president-cuts-sod-for-e30m-water-project-for-wenchi-and-environs","status":"publish","type":"post","link":"https:\/\/wma.gov.gh\/index.php\/president-cuts-sod-for-e30m-water-project-for-wenchi-and-environs\/","title":{"rendered":"PRESIDENT CUTS SOD FOR \u20ac30M WATER PROJECT FOR WENCHI AND ENVIRONS"},"content":{"rendered":"<p style=\"background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; text-align: start; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">The President of the Republic H.E Nana Addo Dankwa Akufo-Addo has cut sod for 30million Euros Water supply Improvement System Project for the Wenchi Municipality.<\/span><\/p>\n<p style=\"background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; text-align: start; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">The new Water Supply System will have its main source from the Tain River for distribution to Wenchi Municipality and surrounding areas. Other facility components of the project include Intermediate Booster Station, Ground Level Tank, Elevated Water&nbsp;<span class=\"textexposedshow\">Tank with the main Treatment Center to be stationed at Akrobi in Wenchi.<\/span><\/span><\/p>\n<p style=\"background: white; margin: 0in 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">Apart from Wenchi township, other targeted beneficiary communities on the main supply line are Wurompo, Awisa, Droboso, Beposo, Yoyoano, Asuano, Koase, Nkonsia, amongst others.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-997\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT1-212x300.jpg\" alt=\"\" width=\"212\" height=\"300\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT1-212x300.jpg 212w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT1.jpg 679w\" sizes=\"auto, (max-width: 212px) 100vw, 212px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-998\" src=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT2-300x300.jpg\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT2-300x300.jpg 300w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT2-150x150.jpg 150w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT2-45x45.jpg 45w, https:\/\/wma.gov.gh\/wp-content\/uploads\/2020\/10\/PREZ-WATER-PROJECT2.jpg 720w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">The Contractor for the project is ASPAC International of Belgium and contract duration is 36 months<\/span><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">The sod cutting ceremony was in fulfilment of the future projects earlier disclosed and promised by the Municipal Chief Executive Dr Prince Kwakye Afriyie.<\/span><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">The project, which adds up to the over 30 newly drilled boreholes and 50 maintained ones, is seen as a big relief to the people of Wenchi as it will end the nightmare and water challenges being faced in parts of the Municipality.<\/span><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">In 2008, a small water system was commissioned with 8 functional pumps under the Wenchi Water Management System. However, the number of pumps fell to 3 with GHC 33, 000 VRA debt by the close of 2016 into 2017. In 2018, Community Water &amp; Sanitation Agency (CWSA) paid the said debt during its Take-Over, and afterwards till date have made some gains.<\/span><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">In a related development, the President cut sod for Droboso &#8211; Agubie &#8211; Badu road, as part of creating access routes to link up the Municipality to other sister districts to expand the business\/economic frontiers of the area.<\/span><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">President Nana Akufo-Addo also inspected ongoing government&#8217;s legendary infrastructural Secondary School Improvement projects at Koase Senior High School. It includes dormitories, 2-Storey Administration Block, Dinning Hall, Classrooms, etc. giving the school a major facelift.<\/span><\/p>\n<p style=\"background: white; margin: 4.5pt 0in 4.5pt 0in;\"><span style=\"color: #1c1e21;\">Credit: Information Services Department (ISD), Wenchi.<br \/>\nBy: Stanick Sofel Amuzu Kpodo\/11th Sep 2020<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The President of the Republic H.E Nana Addo Dankwa Akufo-Addo has cut sod for 30million Euros Water supply Improvement System Project for the Wenchi Municipality. The new Water Supply System will have its main source from the Tain River for distribution to Wenchi Municipality and surrounding areas. Other facility components of the project include Intermediate [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":996,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[7,4],"tags":[],"class_list":["post-994","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects","post-with-thumbnail","post-with-thumbnail-icon"],"_links":{"self":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/comments?post=994"}],"version-history":[{"count":1,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/994\/revisions"}],"predecessor-version":[{"id":1000,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/994\/revisions\/1000"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media\/996"}],"wp:attachment":[{"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/media?parent=994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/categories?post=994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wma.gov.gh\/index.php\/wp-json\/wp\/v2\/tags?post=994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}